Directions for investing

1. Construction of the factory manufacturing rotor blades for WindNovation-based wind power-plants (WPP) (Germany), Russian Wind, LLC

Total cost of the project:
432 mln rubles

Project implementation period:
2017–2020

Forms of investor participation:
Own resources, loan funds

Construction of the factory manufacturing rotor blades for WindNovation-based wind power-plants (WPP)

2.Creation of an IT science park, Cheboksary

Total cost of the project:
400 mln rubles

Project implementation period:
2017–2020 

Forms of investor participation:
Own resources, loan funds

Arrangement of the IT science park on the basis of the existing asset complex

3.Gremyachevo residential district, Cheboksary, Ustra LLC 

Total cost of the project:
11 079 mln rubles

Project implementation period:
2015–2020 

Forms of investor participation:
Own resources, loan funds, funds of participants in shared construction

Comprehensive development of the territory with dwelling houses (6 – 16 floors) for the total area of housing accommodations of 301,0 th. sq. m. The residential district implies construction of 2 kindergartens with beds for 480 children, of secondary school with seats for 1200 children, of service facilities.

4. Residential complex «Pribrezhny» in the micro district «Solyanoe», Cheboksary (LLC «Alza»)

Total cost of the project:
5 670 mln rubles

Project implementation period:
2014–2021 

Forms of investor participation:
Own resources, loan funds, funds of participants in shared construction

Complex development of the territory by residential varied height groups (6 - 16 floors) with a total area of residential space 154.976 sq. meters. Construction of a school for 825 places, preschool educational institutions for 320 seats, shopping centers and offices for trade.

5. Modernization of production of Cheboksary brewing company «Buket Chuvashii» JSC, Cheboksary

Total cost of the project:
1 360 mln rubles

Project implementation period:
2016–2022 

Forms of investor participation:
Own resources, loan funds

Modernization of production (expansion of the brewhouse, modernization of the energy sector, construction of treatment facilities, increase in the bottling capacity of soft drinks, kvass, water) and increase in capacity by 1.5 times

6. Reconstruction of LLC «Cheboksary Meat Plant», Cheboksary

Total cost of the project:
1 200 mln rubles

Project implementation period:
2017–2022 

Forms of investor participation:
Own resources, loan funds

Reconstruction and modernization of the production complex for processing, production, storage of sausages and meat semi-finished products. The output of meat products will increase from 6 to 30 tons per day

7. Renaissance of small towns on the Volga River

Total cost of the project:
17 000 mln rubles

Project implementation period:
2018–2035 

Forms of investor participation:
Budgetary, proprietary or loan funds

Preparation of berths for cruise ships and small vessels, construction of observation platforms, creation of stylized hotel complexes and restaurants, modernization of public gardens, creation of landscape parks

8.Creation of health resort institutions cluster

Total cost of the project:
15 000 mln rubles

Project implementation period:
2018–2035 

Forms of investor participation:
Budgetary, proprietary or loan funds

Creation of a cluster of health resort institutions which use in their activity developments in the field of biotechnology. Development of the Zavolzhskaya Territory of the Chuvash Republic: application of "green" technologies, use of low- and mid-rise residential buildings, development of recreational and leisure functions

9. Creation of a sanatorium, health and recreation complex «Volga», Cheboksary

Total cost of the project:
334 mln rubles

Project implementation period:
2013–2025 

Forms of investor participation:
Own resources, loan funds

Construction of a sanatorium, health, recreation and tourism complex "Volga" for 208 places on the left bank of the Volga river within the boundaries of the village Sosnovka